Time and Work Questions for SBI PO 2026, Practice Free Live Quiz

Time and Work Questions for SBI PO test the relationship between the amount of work completed, efficiency and time. Questions may involve individual workers, combined work, wages, alternate days and pipes and cisterns.

The efficiency method is generally faster than using fractions repeatedly.

Time and Work Questions for SBI PO : Live Quiz

Attempt the free Time and Work live quiz for SBI PO 2026 to evaluate your preparation. The quiz includes exam-oriented questions based on the latest SBI PO pattern, helping you improve calculation speed, accuracy, and identify topics that require more practice.

Time and Work Questions Quiz Score: 0.00

Q1. A completes a job in 12 days and B completes the same job in 18 days. How long will they take to complete the job together?

Solution:
A’s one-day work = 1/12
B’s one-day work = 1/18

Combined one-day work = 1/12 + 1/18
= 3/36 + 2/36
= 5/36

Time taken together = 1 ÷ (5/36)
= 36/5 days
= 7.2 days

Answer: 7.2 days

Q2. A is twice as efficient as B. If B completes a task in 24 days, how long will A take?

Solution:
Efficiency and time are inversely proportional.

A is twice as efficient as B, so A will take half the time taken by B.

A’s time = 24 ÷ 2
= 12 days

Answer: 12 days

Q3. A and B together complete a task in 10 days. A alone completes it in 15 days. In how many days can B alone complete the task?

Solution:
A and B’s combined one-day work = 1/10
A’s one-day work = 1/15

B’s one-day work = 1/10 − 1/15
= 3/30 − 2/30
= 1/30

Therefore, B alone completes the task in 30 days.

Answer: 30 days

Q4. Twelve workers complete a task in 15 days. How many workers are required to complete the same task in 9 days?

Solution:
For the same amount of work:
Workers × Days = Constant

12 × 15 = Required workers × 9

Required workers = (12 × 15) ÷ 9
= 180 ÷ 9
= 20 workers

Answer: 20 workers

Q5. A, B and C can complete a work in 20, 30 and 60 days respectively. How long will they take to complete the work together?

Solution:
A’s one-day work = 1/20
B’s one-day work = 1/30
C’s one-day work = 1/60

Combined one-day work = 1/20 + 1/30 + 1/60
= 3/60 + 2/60 + 1/60
= 6/60
= 1/10

Therefore, they will complete the work together in 10 days.

Answer: 10 days

Quiz Summary

Attempted
0
Correct
0
Wrong
0
Unattempted
5
Final Score: 0.00

Quiz Completed!

You have scored:
0.00

Improve your Quantitative Aptitude preparation by solving more exam-level time and work questions.

Solve More Questions

Important Time and Work Concepts

If A completes a job in x days:

A’s one-day work = 1/x

If A and B work together:

Combined work = 1/x + 1/y

Efficiency and time are inversely proportional.

If efficiency ratio is 2:3, the time ratio is 3:2.

Time and Work Shortcuts

  • Use LCM as total work.
  • Convert days into efficiency units.
  • Distribute wages in the ratio of work completed.
  • In alternate-day questions, calculate work completed in one cycle.
  • Treat filling pipes as positive and emptying pipes as negative.

Common Mistakes

  • Adding the number of days directly
  • Confusing efficiency ratio with time ratio
  • Ignoring partial work
  • Incorrectly distributing wages
  • Treating an outlet pipe as a filling pipe
Also Read
300+ SBI PO English Important QuestionsSBI PO Previous Year Question Paper PDF Free Download for Prelims and Mains Exam
SBI PO Syllabus 2026: Complete Guide for Prelims & MainsDaily Current Affairs for Banking & Govt Exams

FAQs

What is the fastest method for Time and Work?

The LCM-efficiency method is effective for most questions.

Are Pipes and Cisterns related to Time and Work?

Yes. The same work-rate principle applies.

How are wages divided?

Wages are divided in proportion to the work completed by each person.

Saurav Banerjee

Saurav Banerjee is an SEO Content Manager currently working with PracticeMock. He has over 5 years of experience in the ed-tech industry and specializes in using proven SEO and AEO strategies to improve website visibility, organic traffic, and search performance. With expertise in content strategy, search engine optimization, and AI-driven visibility, Saurav focuses on creating impactful digital growth strategies for competitive exam and education platforms. For enquiries, contact: officialsb10@gmail.com

Recent Posts

OICL AO 2026 Final Result Out

OICL AO 2026 Final Result Out! Download the result PDF, check the shortlisted candidates list,…

3 hours ago

SSC JE Tier 2 Result 2026 Out, Download Final Merit List PDF

SSC JE Tier 2 Result 2026 is out. Download the final merit list PDF, check…

4 hours ago

Success Story of Prashant Kumar – From 23 Marks to 97 Percentile

Read the inspiring success story of Prashant Kumar, who overcame failures and personal challenges to…

5 hours ago

IBPS PO Bank Preference List 2026: All 11 Banks & How to Rank Them

Know how to rank your IBPS PO Bank Preference List 2026 the smart way, with…

5 hours ago

IBPS PO Application Form 2026: 15 Common Mistakes Candidates Must Avoid Before Final Submission

Avoid the 15 most common IBPS PO Application Form 2026 mistakes with this expert guide…

6 hours ago

The Hindu Editorial Vocabulary, Download Free PDF

Read The Hindu Editorial Vocabulary to know difficult words with its meanings. We provide monthly…

7 hours ago

Take a Free Test Today

Thousands of aspirants have cleared exams using PracticeMock’s exam-level mock tests.

Take a Free Test Today
Join serious aspirants preparing smarter every day.